“Here to serve: Jesus, each other and the  community”
Donate with JustGiving and PayPal
Another Brick in the Wall

Options

We have looked at a range of options for Gleneagles Church. These are:

  • To remain at our current size and so continue to fit within Redwell Junior School.
  • To move to another community building within our current catchment area.
  • To use other church premises in Wellingborough.
  • To move to another church building outside Wellingborough.

We concluded from this that the only viable option is for new church / community centre premises to be built within our catchment area.

It should be noted that Bee Bee Developments carried out a survey of community needs in 1996 and the requirement for a church building came in the top four needs identified by the local community.  Even non-regular church goers have identified and felt the lack of a recognisable church in the neighbourhood.